An independent commissioning authority for the waterproofing on your building, appointed for the owner. The design checked, the installation tested and the roof looked after in use.

Most roofs fail in the gaps between the people responsible for them

Most roofs fail not because of one catastrophic event, but because of gaps: between design and construction, between handover and maintenance, between the contractor leaving site and the building owner discovering a problem years later.

The roof is designed by one party, priced by another, installed by a third and signed off by the people who built it. Nobody independent checks it for the owner, and once it is covered by paving, planting, ballast or plant, a defect is hard to find and expensive to reach.

Vector closes those gaps. We act for the owner as commissioning authority for the roof and podium waterproofing: we set what the roof must do, check the design against it, help design the monitoring, check the tenders, inspect the work, test it before it is covered and stay on hand once it is in use.

What a commissioning authority does

A commissioning authority is appointed for the owner and is independent of the design team, the contractor and the manufacturer. The role runs through the whole project and rests on three working documents: the owner's requirements, the design team's response to them, and a commissioning plan that says what will be checked, when and by whom.

The service is structured on ASTM E2813, Standard Practice for Building Enclosure Commissioning, and adapted to UK practice. We have taken the independent, phased role from that standard. We do not claim compliance with it.

The service

Seven stages. One appointment.

  1. 01

    Brief

    RIBA Stages 1–2

    We set the roof and podium requirements with you: service life, what sits beneath the roof, access and maintenance limits, and what you want monitoring to tell you.

    You get: Owner's requirements for the roof and podium. Commissioning plan and budget.

  2. 02

    Design peer review

    RIBA Stages 2–4

    Independent review of the roof and podium drawings and specifications at each design stage: falls, drainage, build-up, upstands, penetrations and interfaces. We work with your team to design the monitoring specification.

    You get: Review reports. Risk register. Monitoring specification. Commissioning specification for the contract.

  3. 03

    Tender

    Procurement

    We assess each bidder's quality plan, installer competence, exclusions and proposed substitutions, including any change to the monitoring.

    You get: Tender assessment. Advice on addenda.

  4. 04

    Construction QA

    RIBA Stage 5

    We review submittals, run pre-installation meetings, inspect at agreed hold points and keep the issues and resolutions log.

    You get: Inspection reports. A live issues log that the owner can read at any time.

  5. 05

    Verification

    Before covering

    Electronic leak detection on the waterproofing before it is covered. Breaches are located, repaired and retested. Sensors, where specified, are commissioned and baselined.

    You get: Test records, with defects, repairs and retests. Baseline monitoring data.

  6. 06

    Handover and warranty

    RIBA Stage 6

    Close-out report and maintenance guideline. Inspections through the warranty period, the last one before it expires, so defects are raised while the contractor is still liable.

    You get: Close-out pack. Pre-expiry defects report.

  7. 07

    In use

    RIBA Stage 7

    We review the monitoring data, respond to alerts, inspect the roof and check that it is being maintained as the maintenance guideline sets out. BS 6229:2025 recommends inspecting a flat roof at least twice a year, and we plan the inspections around that.

    You get: Monitoring reports. Inspection reports. A maintenance record that supports the guarantee.

Complete Roof Assurance is the name we have used for the whole appointment, stages one to seven.

Appointed for the owner

The owner or developer appoints us, or the owner's project manager on their behalf, and our reports go to the owner. We are not part of the design team, and on a project where we are commissioning authority we do not also take an appointment from the roofing contractor or the membrane manufacturer.

The design of the waterproofing stays with the design team. Where a review comment is rejected, we ask for a written response that records the risk being accepted.

Where the main contractor wants independent inspection and testing of its own installation, that is a different appointment: see installation QA and testing. Who appointed us is stated in every report. How we are appointed and paid sets out the rest.

Where it is used

  • Green and blue roofs
  • Podium decks and buried roofs
  • Inverted and ballasted roofs
  • CLT and mass timber structures
  • Roofs over space that cannot be taken out of service
  • Data centres, which have their own page

Who it is for

  • Owners, developers and asset holders
  • Housing associations and institutional landlords
  • Project managers and employer's agents acting for them
  • Architects and engineers who want the roof checked independently

What the testing can and cannot show

Every test has limits and our reports state them. An electronic leak detection result applies to the area tested, with the membrane exposed, on the day. A pass means no breach was detected under test conditions.

A sensor reports moisture at its own location. A quiet sensor means no moisture reached that point, not that the roof did not leak somewhere else. That is why testing, monitoring and inspection are used together.

Frequently asked questions

What is roof commissioning?

An independent specialist is appointed for the owner to check that the roof and podium waterproofing is designed, built and tested to do what the owner needs, and stays with the roof once the building is in use. The mechanical and electrical systems in most large buildings are commissioned this way. The roof usually is not.

Who appoints Vector?

The owner or developer, or the owner’s project manager on their behalf. Our reports go to the owner. On a project where we are commissioning authority we do not also take an appointment from the roofing contractor or the membrane manufacturer. See how we are appointed and paid.

Is this the same as Complete Roof Assurance?

Yes. Complete Roof Assurance is the name we have used for the whole appointment, from design to in use. The service is now set out as seven commissioning stages so that it reads the same way on every building type.

Can we appoint Vector for part of it?

Yes. A design review, installation QA and testing or monitoring in use can each be taken alone. Each stage missed reduces what can be checked, and we say in the report which stages we were not appointed for.

Do we have to use a particular sensor system?

No. The monitoring specification is a performance specification that any capable supplier can meet, and we review the data whoever supplied the system. Vector does not sell or supply sensors and has no commercial relationship with any sensor manufacturer. See our independence page.

Is this ASTM E2813 commissioning?

The service is structured on ASTM E2813, Standard Practice for Building Enclosure Commissioning, and adapted to UK practice. It takes the independent, phased role from that standard. It is not a claim of compliance with it.

Appoint the roof's commissioning authority early.

Tell us the scheme and the stage it is at. We will come back with a scope and fee within 48 hours.

Discuss your project

Talk to us

Tell us about the roof

We reply within one working day. Your browser can fill in your name, email and phone if it has them saved.

Urgent? Phone 020 3137 6722 — a form is not the right route for a roof that is leaking now.

Protected by reCAPTCHA. We'll only use your details to reply. See privacy policy.