Installation QA and Testing

Independent inspection while the waterproofing is going down, and a leak test before it is covered. Most defects are decided before the roof is finished.

Why inspect during installation

Workmanship defects are cheap to put right while the roofer is on site and the membrane is exposed: a lap not sealed, an upstand not dressed correctly, a penetration not finished to the manufacturer's detail. The same defect found after the roof is covered means locating it first and then opening the roof to reach it.

BS 6229:2025 recommends that each layer of a flat roof is examined as it is completed and, if necessary, tested BS 6229:2025 · Clause 7 Workmanship As each layer of the flat roof system is completed, it should be examined and, if necessary, tested. Examination applies layer by layer, not only to the finished waterproofing. The clause also requires AVCLs, and breather membranes on a cold roof, to be sealed at all laps, at all penetrations and at abutments between roof and walls, and requires completed work to be examined and if necessary tested for conformance before handover. Extract quoted from BS 6229:2025, © BSI. Summary is Vector’s own wording. Checked against the published standard on 2026-09-11. , and that the programme allows for integrity testing before temporary protection goes down and again after it is removed BS 6229:2025 · Clause 6.2 g) Project schedule Integrity testing of the roof system that is required before temporary protection is installed, and again after removal. Item g) of what the roofing programme has to accommodate. Two tests, not one - which matters on any project where a finished membrane is covered to protect it from follow-on trades and later uncovered before handover. The second test is the one that catches damage done while the roof was out of sight. ASTM D8551 4.5 reaches the same conclusion for geomembranes. Extract quoted from BS 6229:2025, © BSI. Summary is Vector’s own wording. Checked against the published standard on 2026-09-11. . This service carries out both, by someone who did not install the roof.

What we inspect

  • Substrate preparation and condition
  • AVCL continuity and sealing
  • Insulation: type, thickness, orientation, fixing
  • Membrane application: laps, seams, adhesion, thickness
  • Upstands, terminations and edge trims
  • Penetrations: pipe boots, fixings, roof outlets
  • Drainage falls and outlet positions
  • Interfaces with adjacent construction
  • Protection and separation layers

When we attend

  • Pre-start review
  • AVCL installed, before insulation
  • Membrane applied, before protection
  • Details complete, before covering
  • Pre-handover walkdown

Hold points are agreed with the contractor before work starts.

Testing before the roof is covered

We test the exposed membrane by electronic leak detection. A breach is located, repaired and retested while it is still a small repair. We choose the test method to suit the build-up.

Where sensors are specified, they are tested and confirmed reporting to the monitoring platform before the roof is closed up, so the system is in service at handover.

A test result applies to the area tested, with the membrane exposed, on the day. Our reports say what was tested and what was not.

What you receive

A written report for each visit, with photographs and references to the drawings. Non-conformances are stated clearly with the correction needed, and work done correctly is recorded as such. Test records show defects, repairs and retests.

The set forms part of the handover documentation and can be given to a latent defect insurer.

Who appoints us

The owner or developer, where they want the installation checked on their behalf. This is stages four and five of roof and podium commissioning, and it is most use when the design has been reviewed first.

Main contractors also appoint us to inspect and test their roofing subcontractor's work before handover. The inspections and the tests are the same. The report goes to the contractor, and it says so.

We do not take both appointments on one project. How we are appointed and paid.

Tell us the roof and the programme.

We will come back with the hold points we would attend and a fee.

Discuss your project

Talk to us

Tell us about the roof

We reply within one working day. Your browser can fill in your name, email and phone if it has them saved.

Urgent? Phone 020 3137 6722 — a form is not the right route for a roof that is leaking now.

Protected by reCAPTCHA. We'll only use your details to reply. See privacy policy.